Know what every line costs. Protect what it powers.

Meter each department, machine line or tenant in your industrial park, see live demand and monthly costs side by side, and analyse power quality on the incomer. Add the PSNA-6 to trip circuits on dangerous voltage.

Sound familiar?

One bill, no breakdown

The TNB bill tells you the total, not which department or machine line is driving it.

Voltage damage

A single over- or under-voltage event can take out expensive equipment.

Manual sub-meter readings

Spreadsheets of monthly readings are slow, error-prone and always out of date.

How it works

  1. 01

    Meter the sub-boards

    CT-operated three-phase meters on each department or line; a power analyser on the incomer.

  2. 02

    Live data to the cloud

    Demand, energy and power factor stream to the dashboard over 4G.

  3. 03

    Allocate costs

    Group meters by department, line or tenant and see the cost of each.

  4. 04

    Protect circuits

    With the PSNA-6, circuits trip on over-voltage, under-voltage or leakage before equipment is damaged.

In the field

Acrel ADW300W installed alongside the circuit breakers, showing a live 240.4 V reading.
Acrel ADW300W installed alongside the circuit breakers, showing a live 240.4 V reading.
The distribution board on site, with the 4G antenna mounted on top for a reliable uplink.
The distribution board on site, with the 4G antenna mounted on top for a reliable uplink.

Estimate your cost

Meter
Meters, one-time
Platform, 12 months RM 10 / meter / month
4G data plans, 12 months from RM 35 / SIM
Upfront, first year
Then, from year 2

List prices. Excludes installation. Optional online payments: 5% per tenant top-up. Large sites: contact us for custom pricing.

Get an exact quote

Built into the platform

01

Cost centres

Group meters by department, line or tenant for cost allocation.

02

Power quality

Harmonics, power factor and full electrical parameters with the Acrel analyser.

03

Voltage protection

Over- and under-voltage trip thresholds set from the cloud (PSNA-6).

04

Usage history

Daily and monthly energy for every metering point.

Common questions

Can I use Splinergy just for monitoring, without billing tenants?

Yes. You can use Splinergy purely for monitoring: live voltage, current, power and kWh with usage history, for cost allocation between departments, energy audits or finding waste.

Which meter do I need?

Single-phase meters suit individual rooms, apartments and small shops. Three-phase meters suit shoplots, workshops and sub-mains. Choose DIN-rail models for distribution boards and wall-mounted models for meter boards. Not sure? Send us a photo of your distribution board and we'll recommend one.

What is the difference between a smart meter and the PSNA-6 breaker?

Smart meters measure usage, handle billing and can switch supply on or off. The PSNA-6 modular breaker adds breaker-grade protection on each circuit (residual-current/leakage, over-voltage and under-voltage trip) with thresholds set from the cloud.

Should I choose 4G or Wi-Fi meters?

Choose Wi-Fi if the building has stable Wi-Fi reaching every distribution board: the hardware costs less and there is no data plan. Choose 4G where Wi-Fi is weak or unavailable, such as basements, meter rooms and remote sites.

Who installs the meters?

Meters are installed inside the distribution board. Our team can install them for you, or your own registered electrician or contractor can do it. Tell us about your site and we'll advise on the right setup.

How much does the Splinergy platform cost?

The Splinergy platform is RM 10 per meter per month, on a 12-month contract paid upfront (RM 120 per meter per year). On the PSNA-6, every module counts as one meter, including the gateway. Hardware is a one-time purchase from RM 130, and 4G meters need a data plan from RM 35 per year. For large sites, contact us for custom pricing.

See all FAQs

Want a breakdown of your factory's energy?

Send us your single-line diagram or a photo of the main board and we'll propose metering points.